In between raining days, quite a lot of work was done.
The cladding install was completed to the roof line and all cladding was painted! The matrix cladding is painted in a half strength called “wise owl”. We made sure we double checked with our site supervisor before the painting started that it was half strength. This was to make sure nobody’s time was wasted and our build works weren’t delayed.
The colour matching was perfect!
The most exciting thing for us was the install of our first floor roof windows! They look amazing!