Posts tagged with: Roof Windows

Week Eighteen & Nineteen – Roof Windows

In between raining days, quite a lot of work was done. The cladding install was completed to the roof line and all cladding was painted! The matrix cladding is painted in a half strength called “wise owl”. We made sure we double checked with our site supervisor before the painting started that it was half strength. This was to make sure nobody’s time was wasted and our build works weren’t delayed. The colour matching was

Plan Presentation Appointment

July 18 2017 We received our Issue A plan documents and had reviewed them and come up with a list of changes we’d like to make to them. I must admit they did a fantastic job at fitting my changes into the first draft of the plans, there were only very minor changes required to them ┬ásuch as windows and fittings like the shower screen/overhead cupboards required. Overall we were very pleased with what Rawson

Top